Section 01 · VP & Handover
The first thirty days decide everything.
Vacant Possession is when developer obligations crystallise. Skip the joint inspection or miss the defect window, and the cost of every "small thing" lands on you.
- 01 DLP 24 months — strata vs landed: when the rules differ 23 Apr 2026
- 02 Joint inspection — buat sendiri atau hire profesional inspector? 16 Apr 2026
- 03 CCC vs CCM vs Occupation Permit — what each one actually means 09 Apr 2026
- 04 Senarai semak VP rumah baru — apa yang kena tuntut waktu DLP 02 Apr 2026